Monte Cañón

Degraded

Galicia · Wind · 74 MW installed · 6 technicians · manager Kiarra Swaniawski

Output now

34.7 MW

Load factor

47 %

Energy today

622 MWh

Availability

96.9 %

Producing

12 / 16

Open alarms

4

Generation
Last 12 hours
Wind, solar and battery power at the point of interconnection. A charging battery shows below zero.
Conditions
Resource and grid

Wind

10.3 m/s SSW

Irradiance

0 W/m²

Temperature

13.2 °C

Cloud cover

57 %

Conditions

Partly cloudy

Substation

Mesón SE 220 kV

Voltage

220.8 kV

Frequency

49.975 Hz

Power factor

0.975

Curtailment

19 %

Day-ahead price

54.49 €/MWh

Assets

16 assets on site. Open one for its live 3D view.

Power flow

Wind turbine

WTG-01

Siemens Gamesa SG 5.0-145 · 6.2 MW

Producing
18%

Output

1.11 MW

Today

51.9 MWh

Wind

7.8 m/s

Wind turbine

WTG-02

Siemens Gamesa SG 6.6-170 · 4.2 MW

Producing
100%

Output

4.20 MW

Today

38.4 MWh

Wind

12.0 m/s

Wind turbine

WTG-03

Nordex N149/4.0-4.5 · 6.2 MW

Producing
94%

Output

5.82 MW

Today

63.0 MWh

Wind

12.7 m/s

Wind turbine

WTG-04

Siemens Gamesa SG 5.0-145 · 5.0 MW

Producing
39%

Output

1.93 MW

Today

40.2 MWh

Wind

9.4 m/s

Wind turbine

WTG-05

Nordex N149/4.0-4.5 · 6.2 MW

Producing
46%

Output

2.82 MW

Today

45.7 MWh

Wind

9.9 m/s

Wind turbine

WTG-06

Vestas V162-6.2 · 5.0 MW

Producing
90%

Output

4.51 MW

Today

41.5 MWh

Wind

12.2 m/s

Wind turbine

WTG-07

Vestas V162-6.2 · 4.2 MW

Curtailed
25%

Output

1.03 MW

Today

17.8 MWh

Wind

10.0 m/s

Wind turbine

WTG-08

Nordex N149/4.0-4.5 · 6.2 MW

Producing
10%

Output

0.59 MW

Today

64.8 MWh

Wind

6.6 m/s

Wind turbine

WTG-09

Vestas V150-4.2 · 6.2 MW

Producing
70%

Output

4.34 MW

Today

64.1 MWh

Wind

10.9 m/s

Wind turbine

WTG-10

Siemens Gamesa SG 5.0-145 · 6.2 MW

Producing
20%

Output

1.22 MW

Today

50.6 MWh

Wind

8.0 m/s

Wind turbine

WTG-11

Siemens Gamesa SG 6.6-170 · 5.0 MW

Producing
90%

Output

4.47 MW

Today

49.5 MWh

Wind

11.6 m/s

Wind turbine

WTG-12

Vestas V162-6.2 · 5.0 MW

Standby
0%

Output

0.00 MW

Today

40.1 MWh

Wind

7.8 m/s

Wind turbine

WTG-13

Siemens Gamesa SG 5.0-145 · 4.2 MW

Producing
19%

Output

0.79 MW

Today

32.0 MWh

Wind

7.9 m/s

Wind turbine

WTG-14

Vestas V150-4.2 · 4.2 MW

Curtailed
46%

Output

1.91 MW

Today

22.7 MWh

Wind

13.1 m/s

Inverter skid

INV-01

SMA Sunny Central 4600 UP · 5.0 MVA

Producing
5%

Output

0.25 MW

Today

37.4 MWh

Availability

99.6 %

Inverter skid

INV-02

Sungrow SG3125HV-MV · 5.0 MVA

Curtailed
11%

Output

0.56 MW

Today

25.4 MWh

Availability

94.2 %

Alarms
Site alarms
Most recent events from this site's assets.

Blade ice detected

WTG-02· 10-28 15:15
Medium

IGBT temperature high

INV-02· 10-28 08:24
Low

Pitch system hydraulic pressure low

WTG-05· 10-28 00:57
Low

Yaw misalignment above limit

WTG-07· 10-27 20:39
Low